Materials Checklist
- Solar Group
Steel Drive - In Post Kit
Blain # 040335
View Detail 
- Mailbox (any size)
Blain # 044539
View Detail 
- Solar Group Mailbox Mounting Brackets
Blain # 379931
View Detail 
- Four, #10 x 1-1/2” Round Head Tapping Screws
- Four, #10-24 x 1-1/2” Round Head Machine Screws
- Eight, #10-24 x 3/4” Round Head Machine Screws
- Eight, #10-24 Hex Head Nuts
- Eight, #10 Flat Washers
- Duracraft®
Rubber Mallet
Blain # 483881
View Detail 
- Klein Tools®
10 - In - 1 Screwdriver
Blain # 471654
View Detail 
- Duracraft Pro®
Adjustable Wrench
Blain # 432241
View Detail 
|
Instructions
- Using a mallet, drive the 36” post anchor into the ground until the stabilizing plate is flush with the ground’s surface. For proper positioning, face the flat surface of the stabilizing plate parallel to the road.
- Insert the 42” post, (or mailbox base), onto the grounded anchor. Be careful to properly place the anchor into the provided channels in the post. The predrilled holes on the post must face upward, in order to mount the mailbox bracket.
- Align mounting holes on the bracket sides with the holes on the post top and secure with the four #10 x 1 1/2” tapping screws.
- Top Mount. When the mailbox bracket mounts directly to the top of the post, attach the adjustable mailbox mounting bracket with four #10 x 1 1/2” tappping screws through the predrilled holes on the side supports of the bracket. Direct the screws through the holes on the post top.
- Parallel Mount. The bracket mounts to any standard 4”x4” horizontal post arm. Attach the bracket with four #10 x 1 1/2” tapping screws through the predrilled holes on the top surface of the adjustable
mail box mounting bracket. Then direct the screws through the post arm. (Note: Allow appropriate clearance space between the back of the bracket and the upright post arm, depending on the mailbox size).
- Perpendicular Mount. The bracket mounts perpendicular to any standard 4”x4” horizontal post arm. This way is ideal for multiple mount situations. Attach the bracket with four #10 x 1 1/2” tapping screws through predrilled holes on top surface of adjustable mailbox mounting bracket. Then direct the screws through the holes in the post arm.
- Standard, 1-1 Mailbox. Place the mailbox directly onto the bracket, aligning the two mounting holes on each side of the mailbox. Attach the mailbox by inserting the four 10- 24 x 3/4” round head machine screws through the mailbox and bracket. Place flat washers against inside of bracket, attach the hex head nuts and tighten.
- Medium 1-1 1/2 Mailbox. Snip the four 7/8” cylinder shaped spacers from the bracket. Place the mailbox directly over the bracket, aligning the two mounting holes on each side. Attach the mailbox by inserting the four spacers between the mailbox and the bracket. Insert four #10-24 x 1 1/2” round head machine screws through the mailbox, spacer and bracket. Place the flat washers against the inside of the bracket, attach the hex head nuts and tighten.
- Large, 2-2 Mailbox. Snip the four large rectangular shaped spacers from the bracket. Attach the four spacers to the bracket, two on each side, with the four #10-24 3/4” round head machine screws. Make sure the arrow on the spacer points outward, away from the bracket. Place the flat washer against inside of the spacer, attach hex head nuts and tighten. Place the mailbox over the bracket, aligning holes on the mailbox with the holes on the attached bracket spacers.
- Large, 2-2 Mailbox, continued. Insert four #10-24 x 3/4” round-head machine screws through the mailbox and into the spacers. Place the flat washers against the inside of the spacer, attach hex head nuts and tighten.
- Molded and Wood Covered Mailboxes. Use any of the available spacers and hardware to custom fit molded and wood covered mailboxes, using above instructions as necessary. Often, as with many polyboxes, spacers need to be used only on one side of the bracket. If mounting holes do not align on odd shaped mailboxes, drill holes in bracket as necessary.
- As with any digging project, be sure you have underground utilities located before you dig. Call 811 or visit the website below for state specific diggers hotline information: http://www.call811.com/state-specific.aspx
- Finally, the U.S. Post Office has specifications for both height and distance back from the edge of the street. Please be sure you verify USPS Mailbox Requirements before install: https://www.usps.com/manage/know-mailbox-guidelines.htm
|